One thing that would really help batteries is permitting reform. The BAAJA reform bill would really help not just the batteries themselves but the transmission lines which are far more difficult to construct thank to an insane system and lots of lawsuits.
Grid capacity both locally and at the transmission level is still the biggest factor when it comes to site viability though. You can't back feed a municipal water system by connecting a fire hose to a random house's hose spigot.
Regardless, battery sites are becoming a big thing in long term RE investing because being able to have this site plan developed under favorable rules while all the other rules only ever get worse makes these sites potentially hugely valuable when the batteries are gone in decades.